The Commission began its inspection at the road drainage pipe system in the lawn. The existing septic tank and the new water softener backwash infiltration site were located. The existing septic leach field and the location of the proposed curtain drain were inspected. The location of the discharge from the curtain drain into an existing swale was followed along Wood Road to a small stream.
The site inspection ended at 6:20 pm.