Minutes
LOCATION: Marie DaSilva, Application #15-08
398 Newtown Turnpike
PRESENT:
COMMISSION: D. Pattee, S. Green, W. Perlman, S. Robinson
APPLICANT: J. DaSilva
The Commission began its inspection along the driveway, noting the extensive earth movement that has occurred behind the garage and next to the property line on the south side of the property. Just off the property is a drainage corridor, portions of which has received siltation from the DaSilva activities. There were no sediment and erosion controls installed along the edge of the bare earth. Upslope, the Commission observed an area of a stone patio and a stone lined pond.
The Commission inspected the drainage corridor that connects to a large culvert under Newtown Turnpike that has been there for some time.
The site inspection ended at 5:45 pm.
Submitted by David Pattee