Select Page

Minutes of Conservation Commission Site Inspection, 09/23/2018

AGENDA: Conservation Commission Site Inspection

RECEIVED 09/27/2018 9:08am
Michele R. Grande – Redding Town Clerk

Minutes of Site Inspection

LOCATION: Bowen Zheng Application #18-08
315 Black Rock Turnpike

DATE: September 23, 2018

TIME: 9:30 AM

PRESENT:
COMMISSION
D. Pattee
B. Hill
W. Perlman
S. Robinson
A. Pardee (WEO)

APPLICANT
B. Zheng & family

The Commission inspected the area of the replacement building addition. New foundation walls have been constructed. A new reinforced concrete pipe has been installed in the stream channel to convey the stream under the replacement building. The existing septic tank was noted to be in the driveway but no information as to the leach field location. Mr. Zheng was requested to have a hydrology professional check the size of the concrete pipe for carrying capacity and to also check with D. Hartline to determine the location of the septic leach field.

The site inspection ended at 10:00 am.

Submitted by David Pattee

The owner of this website has made a commitment to accessibility and inclusion, please report any problems that you encounter using the contact form on this website. This site uses the WP ADA Compliance Check plugin to enhance accessibility.