Minutes
LOCATION: Stepney Road Bridge Application #14-11
DATE: August 10, 2014
TIME: 9:00 AM
PRESENT:
COMMISSION APPLICANT
D. Pattee J. Pemberton
S. Green
W. Perlman
J. Ross
The Commission started its inspection on the north side of the bridge looking at the existing wing walls and the areas of the new wing walls. The dam upstream was also observed. The inspection continued to the south side of the bridge where the underside of the bridge was observed. The poor condition of the bridge support beam system and the southwest wing wall was noted. The high water mark as evidenced by the scour line was also noted.
The site inspection ended at 9:50 am.
Submitted by David Pattee