Minutes of Site Inspection
LOCATION: Jonathan & Jennifer Cutler Application #22-03
106 Peaceable Street
DATE: February 26, 2022
TIME: 9:00 AM
PRESENT: COMMISSION
- Pattee
- Green
- Hill
- Perlman
- Robinson
APPLICANT:
- Cutler
- Cutler
The Commission began the site inspection at the area of the proposed cottage and garage. The route of the septic line from the cottage to the new tank was noted as below the ridge line to provide a gravity flow system. The location of the new leach field below the ridge line was also observed. The route for equipment access was pointed out by Mr. Cutler.
The site inspection ended at 9:15 am.
Submitted by: David Pattee